Spokane County Coffee Cart Permits

Spokane, Washington

Issuing agency

Spokane Regional Health District

Commissary

It depends

Plan review

Yes

Last verified

November 2026

Spokane Regional Health District (SRHD) issues mobile food permits across Spokane County. A pushcart always needs a commissary kitchen and a daily return there, and plain coffee or tea poured into single-use cups is on SRHD's list of foods that need no permit.

How to get permitted

  1. 1Arrange a commissary and sign SRHD's Commissary Agreement (required for pushcarts).
  2. 2Send the Mobile Unit Plan Review Packet two weeks or more before opening, then wait until SRHD approves it in writing.
  3. 3Pay your permit fee 3 or more days ahead of the pre-operational inspection.
  4. 4Pass the inspection of your cart and commissary.
  5. 5Get approval from the City of Spokane, City of Spokane Valley or your local building official.
  6. 6Sign a restroom agreement for any spot where you park more than 1 hour.

Full permit packet, $19

Get the Spokane County permit packet

  • Everything on this page in one printable PDF, with official contacts and links
  • Document list, equipment and sink checklist, plan review prep
  • Inspection day checklist, fee worksheet and a realistic timeline

Emailed as a PDF right after checkout. A summary to work from, not legal advice.

Free

Get the Spokane County checklist

Who issues the permit, the steps in order, documents to gather and the official links, as a PDF.

Who issues the permit

State, county and city
SRHD handles plan review, permits and inspections countywide. Spokane and Spokane Valley each run their own city approval, and businesses in other cities should check with the local building official.

Permits you'll need

  • SRHD food establishment permit for a mobile unit (annual)
  • SRHD mobile unit plan review
  • SRHD mobile unit reciprocity (secondary permit)
  • SRHD Commissary Agreement
  • SRHD temporary food establishment (TFE) permit
  • City approvals (City of Spokane, City of Spokane Valley and others)
How espresso carts are classified
SRHD lists plain coffee or tea poured into single-use cups among foods that need no permit. A pushcart must always use a commissary, and SRHD sets your permit category.

Commissary and plan review

Commissary required
It depends (see below)
How it works
Vans and trailers can use a commissary or be approved as fully self-contained, but a pushcart always needs a commissary kitchen and must return daily for cleaning. If you do not own the kitchen, you need SRHD's signed Commissary Agreement, which cannot be transferred and ends with a change of owner. With no 3-compartment sink on board, bring enough spare utensils and clean them at the commissary when the day ends.
Plan review required
Yes

Sinks and water

Sinks
The handwash tank needs a capacity of 5 gallons or more. With no 3-compartment sink on board, bring spare utensils and clean them at the commissary each day.
Water tanks
Your waste tank needs to be 15% or more bigger than your fresh water tank.

Fees

Permit fees
2026 calendar year: a mobile unit with an approved kitchen pays $630. A supplemental mobile permit is $340, and an additional mobile permit is $120. Applying less than 14 days before opening adds a penalty equal to the permit fee, and card payments add 3.25%.
Plan review fee
2026: a $270 submittal fee up front, then $180 an hour for the pre-operational inspection. Building without approval is billed at $270 an hour, and expedited review is a $405 submittal fee plus $270 an hour. Reciprocity has no plan review fee, but the administrative fee is listed as both $60 and $90, so confirm the amount with SRHD.

As published in November 2026. Fees change, so confirm before you apply.

Inspections, events and fire safety

Inspection
Send the Mobile Unit Plan Review Packet with your menu, how you prepare each item, a floor plan drawn to scale showing plumbing, NSF or equal equipment (no home appliances), finish, lighting and cleaning schedules, water and wastewater sites, and commissary papers, at least 14 days before opening. Wait for written approval before building. Pay your permit fee 3 or more days ahead of the pre-operational inspection, which covers both the cart and the commissary, and bring your L&I approval if it applies. SRHD then inspects 1 to 2 times a year unannounced.
Events and markets
Event booths need an SRHD TFE permit. Standalone or pop-up booths are not allowed, and neither are private events such as weddings. A TFE covers one event of up to 21 days in a row, or up to 3 days a week at a repeating event like a farmers market. Apply 14 days ahead or fees may double; SRHD will not take applications under 3 days out. 2026 TFE fees run from $120 to $520.

Food handler and business license

Business license and taxes
Spokane and Spokane Valley each require their own city approval, apart from your SRHD permit. In other cities, ask the local building official.

Anything not covered here: ask Spokane Regional Health District (SRHD), Food Safety Program before you apply.

Official links

Application and forms

Resources for new cart owners

Some resource links are referral links. We may earn a fee, at no cost to you.

Common questions

Who issues coffee cart permits in Spokane County?

Spokane Regional Health District (SRHD), Food Safety Program. SRHD handles plan review, permits and inspections countywide. Spokane and Spokane Valley each run their own city approval, and businesses in other cities should check with the local building official.

Does a coffee cart in Spokane County need a commissary?

Vans and trailers can use a commissary or be approved as fully self-contained, but a pushcart always needs a commissary kitchen and must return daily for cleaning. If you do not own the kitchen, you need SRHD's signed Commissary Agreement, which cannot be transferred and ends with a change of owner. With no 3-compartment sink on board, bring enough spare utensils and clean them at the commissary when the day ends.

Is plan review required for a coffee cart in Spokane County?

Yes. Submit plans before you build or buy the cart. Fee: 2026: a $270 submittal fee up front, then $180 an hour for the pre-operational inspection. Building without approval is billed at $270 an hour, and expedited review is a $405 submittal fee plus $270 an hour. Reciprocity has no plan review fee, but the administrative fee is listed as both $60 and $90, so confirm the amount with SRHD..

How much does a coffee cart permit cost in Spokane County?

2026 calendar year: a mobile unit with an approved kitchen pays $630. A supplemental mobile permit is $340, and an additional mobile permit is $120. Applying less than 14 days before opening adds a penalty equal to the permit fee, and card payments add 3.25%. (as of November 2026). Fees change, so confirm before you apply.

Can I serve at events in Spokane County with my cart?

Event booths need an SRHD TFE permit. Standalone or pop-up booths are not allowed, and neither are private events such as weddings. A TFE covers one event of up to 21 days in a row, or up to 3 days a week at a repeating event like a farmers market. Apply 14 days ahead or fees may double; SRHD will not take applications under 3 days out. 2026 TFE fees run from $120 to $520.

Please note: Requirements change. This is a summary, not legal advice. Confirm with the county before buying equipment.