Lewis County Coffee Cart Permits

Centralia, Washington

Issuing agency

Lewis County Public Health & Social Services

Commissary

It depends

Plan review

Yes

Last verified

November 2026

Lewis County Public Health & Social Services issues the permit a coffee cart needs, through the county's Online Permit Center. Expect plan review, a commissary agreement unless your cart is fully self-sufficient, and approval from the city where you plan to park.

How to get permitted

  1. 1Find a commissary and get a signed agreement that covers wastewater disposal, or confirm you qualify for the self-sufficiency exemption.
  2. 2Get Washington L&I approval for your unit if it applies.
  3. 3Apply in the Lewis County Online Permit Center at least a month before opening, uploading your plans, menu, route and sneeze guard details.
  4. 4Pay the plan review fee and the annual permit fee.
  5. 5Get approval from each city where you plan to park and operate.

Full permit packet, $19

Get the Lewis County permit packet

  • Everything on this page in one printable PDF, with official contacts and links
  • Document list, equipment and sink checklist, plan review prep
  • Inspection day checklist, fee worksheet and a realistic timeline

Emailed as a PDF right after checkout. A summary to work from, not legal advice.

Free

Get the Lewis County checklist

Who issues the permit, the steps in order, documents to gather and the official links, as a PDF.

Who issues the permit

State, county and city
The county health department handles the food permit and plan review, and it sends your file to local planning, water, sewer and building staff to sign off. Each city decides whether you can park and operate there.

Permits you'll need

  • Lewis County food establishment permit for mobile units (category 3 or 4)
  • Food establishment plan review
  • Temporary food establishment permit (single or multiple events)
  • Washington L&I food truck approval
  • City approval to park and operate
How espresso carts are classified
Fees follow your menu's risk. A menu in Risk Category 1 or 2 is billed at the category 3 rate, while a Risk Category 3 menu is billed at the category 4 rate. A certified food protection manager is usually needed for risk categories 3 to 6, but a mobile coffee unit is named as one of the exceptions.

Commissary and plan review

Commissary required
It depends (see below)
How it works
You need an approved commissary unless your cart is fully self-sufficient under RCW 43.20.148. The agreement is uploaded with your application, must include approved wastewater disposal, and is renewed every year. Any food made off the cart has to come from an approved commissary kitchen, never your home.
Plan review required
Yes

Sinks and water

Water tanks
Only public water sources are accepted.

Fees

Permit fees
2026: $590 for a mobile unit with a Risk Category 1 or 2 menu, or $610 with a Risk Category 3 menu. Applying after January 31 adds a $115 late fee, opening without a permit adds $190, and a reinspection is $155.
Plan review fee
2026: $305 covers the first 2.5 hours, then $150 an hour. Consultations are $150 an hour, 1 hour minimum.

As published in November 2026. Fees change, so confirm before you apply.

Inspections, events and fire safety

Inspection
Apply online at least a month before opening. You list a home base address and each service site, and your assigned inspector must approve new sites. Uploads include active managerial control papers covering date marking, staff illness, cleanup of vomit and diarrhea, and allergens, plus a floor plan, menu, L&I approval, a picture of your unit, a typical route, the commissary agreement and, for a cart, details of its sneeze guard.
Events and markets
A temporary permit covers a single event lasting up to 21 days, or a repeating event such as a farmers market on up to three days each week. 2026 single event fees: very low risk $115, low to medium risk $135, high risk $170 (nonprofits pay $69, $81 or $102). Multiple event permits: very low risk $205; low to medium risk $440 for the year or $220 for a season; high risk $525 for the year. Food prepared off site for an event needs an approved commissary kitchen and agreement.

Food handler and business license

Food handler or manager
Risk categories 3 through 6 usually need a certified food protection manager, though a mobile coffee unit is listed as an exception. Confirm what applies to your menu with the county.
Business license and taxes
As part of review, the county asks local planning, water, sewer and building departments to sign off. You also need the go-ahead from each city where you plan to park and serve.

Anything not covered here: ask Lewis County Public Health & Social Services, Environmental Health Food Safety Program before you apply.

Official links

Application and forms

Resources for new cart owners

Some resource links are referral links. We may earn a fee, at no cost to you.

Common questions

Who issues coffee cart permits in Lewis County?

Lewis County Public Health & Social Services, Environmental Health Food Safety Program. The county health department handles the food permit and plan review, and it sends your file to local planning, water, sewer and building staff to sign off. Each city decides whether you can park and operate there.

Does a coffee cart in Lewis County need a commissary?

You need an approved commissary unless your cart is fully self-sufficient under RCW 43.20.148. The agreement is uploaded with your application, must include approved wastewater disposal, and is renewed every year. Any food made off the cart has to come from an approved commissary kitchen, never your home.

Is plan review required for a coffee cart in Lewis County?

Yes. Submit plans before you build or buy the cart. Fee: 2026: $305 covers the first 2.5 hours, then $150 an hour. Consultations are $150 an hour, 1 hour minimum..

How much does a coffee cart permit cost in Lewis County?

2026: $590 for a mobile unit with a Risk Category 1 or 2 menu, or $610 with a Risk Category 3 menu. Applying after January 31 adds a $115 late fee, opening without a permit adds $190, and a reinspection is $155. (as of November 2026). Fees change, so confirm before you apply.

Can I serve at events in Lewis County with my cart?

A temporary permit covers a single event lasting up to 21 days, or a repeating event such as a farmers market on up to three days each week. 2026 single event fees: very low risk $115, low to medium risk $135, high risk $170 (nonprofits pay $69, $81 or $102). Multiple event permits: very low risk $205; low to medium risk $440 for the year or $220 for a season; high risk $525 for the year. Food prepared off site for an event needs an approved commissary kitchen and agreement.

Please note: Requirements change. This is a summary, not legal advice. Confirm with the county before buying equipment.