Rowan County Coffee Cart Permits

Salisbury, North Carolina

Issuing agency

Rowan County Health Department

Commissary

Yes

Plan review

Yes

Last verified

November 2026

Rowan County Environmental Health permits mobile food units and push carts after reviewing scaled plans. You need a commissary kitchen you visit daily, and for a milk-based drink menu note that coolers are not allowed: food must stay in mechanical refrigeration.

How to get permitted

  1. 1Get a restaurant owner to sign the Restaurant Approval (commissary) form.
  2. 2Draw scaled plans and gather spec sheets, your menu and an operating schedule.
  3. 3Submit the packet with the $150 plan review fee and wait for approval before building.
  4. 4Pass the permit inspection with refrigeration running.
  5. 5Apply for a temporary food establishment permit at least 5 business days before each event.

Full permit packet, $19

Get the Rowan County permit packet

  • Everything on this page in one printable PDF, with official contacts and links
  • Document list, equipment and sink checklist, plan review prep
  • Inspection day checklist, fee worksheet and a realistic timeline

Emailed as a PDF right after checkout. A summary to work from, not legal advice.

Free

Get the Rowan County checklist

Who issues the permit, the steps in order, documents to gather and the official links, as a PDF.

Who issues the permit

State, county and city
Rowan County Environmental Health permits carts whose commissary is in the county. Each city and town handles zoning and location rules separately.

Permits you'll need

  • Push cart permit (Rowan County Environmental Health)
  • Mobile food unit permit (Rowan County Environmental Health)
  • Mobile food unit and push cart plan review
  • Restaurant approval (commissary agreement) form
  • Temporary food establishment permit
How espresso carts are classified
Rowan County push carts may only prepare and serve prepackaged foods and hot dogs. Ask Environmental Health which permit fits an espresso cart.

Commissary and plan review

Commissary required
Yes
How it works
You report to your commissary kitchen at least daily to restock, clean, fill water and dump all solid and liquid waste, and it needs an area that drains your sewage tank into an approved system. The owner of the restaurant signs the Restaurant Approval form in your packet, agreeing you will check in daily and store all supplies there, since supplies cannot be kept in a private home. If the commissary is on a well or septic system, the county must evaluate and approve it.
Plan review required
Yes

Sinks and water

Water tanks
Your wastewater tank must be at least 15% bigger than your fresh water tank.

Fees

Permit fees
Contact the permitting agency to confirm.
Plan review fee
Plan review for a mobile food unit or pushcart is $150, per the Rowan County Environmental Health fee schedule that took effect July 1, 2026. If the unit is not ready at its permit visit, the revisit costs $75, with $25, $50 and then $100 more for further revisits.

As published in November 2026. Fees change, so confirm before you apply.

Inspections, events and fire safety

Inspection
Your packet needs the application and $150 fee, scaled drawings (1/4 inch per foot) of the equipment layout, equipment spec sheets, a full menu marking commissary prep, the signed commissary form and a schedule of locations and times. Do not start building until the plans are approved. Food must stay in mechanical refrigeration while driving and selling, so plan a power source, such as a generator, battery bank or inverter, able to run it on the road. The application is not complete until you pay, and payments are taken until 4 p.m. on business days.
Events and markets
A $75 temporary food establishment permit covers an event of up to 15 days, and inspectors check vendors on site. Apply and pay at least 5 business days ahead, or 3 days ahead if you are a replacement vendor.

Food handler and business license

Business license and taxes
Ask Salisbury Development Services, and the zoning staff in every town where you want to set up, about local food truck rules.

Anything not covered here: ask Rowan County Health Department, Environmental Health Division (Food and Lodging Sanitation) before you apply.

Official links

Application and forms

Resources for new cart owners

Some resource links are referral links. We may earn a fee, at no cost to you.

Common questions

Who issues coffee cart permits in Rowan County?

Rowan County Health Department, Environmental Health Division (Food and Lodging Sanitation). Rowan County Environmental Health permits carts whose commissary is in the county. Each city and town handles zoning and location rules separately.

Does a coffee cart in Rowan County need a commissary?

You report to your commissary kitchen at least daily to restock, clean, fill water and dump all solid and liquid waste, and it needs an area that drains your sewage tank into an approved system. The owner of the restaurant signs the Restaurant Approval form in your packet, agreeing you will check in daily and store all supplies there, since supplies cannot be kept in a private home. If the commissary is on a well or septic system, the county must evaluate and approve it.

Is plan review required for a coffee cart in Rowan County?

Yes. Submit plans before you build or buy the cart. Fee: Plan review for a mobile food unit or pushcart is $150, per the Rowan County Environmental Health fee schedule that took effect July 1, 2026. If the unit is not ready at its permit visit, the revisit costs $75, with $25, $50 and then $100 more for further revisits..

How much does a coffee cart permit cost in Rowan County?

Contact the permitting agency to confirm.

Can I serve at events in Rowan County with my cart?

A $75 temporary food establishment permit covers an event of up to 15 days, and inspectors check vendors on site. Apply and pay at least 5 business days ahead, or 3 days ahead if you are a replacement vendor.

Please note: Requirements change. This is a summary, not legal advice. Confirm with the county before buying equipment.