Cobb County Coffee Cart Permits

Marietta, Georgia

Issuing agency

Cobb & Douglas Public Health

Commissary

Yes

Plan review

Yes

Last verified

November 2026

Cobb & Douglas Public Health permits your base of operation and each pushcart based in Cobb, and your menu decides what equipment both need. Carts already permitted in another Georgia county file for an out-of-county Authorization to Operate instead.

How to get permitted

  1. 1Secure a permitted base of operation and get its Base of Operation permit.
  2. 2Prepare scaled plans for your cart and fill out the in-county mobile unit application.
  3. 3Get written property owner permission and a toilet within 200 feet for each spot, and clear it with zoning.
  4. 4Submit the application with plan review and annual fees, then pass inspection.
  5. 5Get an Occupation Tax Certificate from Cobb County or your city.

Full permit packet, $19

Get the Cobb County permit packet

  • Everything on this page in one printable PDF, with official contacts and links
  • Document list, equipment and sink checklist, plan review prep
  • Inspection day checklist, fee worksheet and a realistic timeline

Emailed as a PDF right after checkout. A summary to work from, not legal advice.

Free

Get the Cobb County checklist

Who issues the permit, the steps in order, documents to gather and the official links, as a PDF.

Who issues the permit

State, county and city
The health district issues the food permits. Business licensing is through Cobb County in unincorporated areas or through the city you sell in, and zoning and fire approvals come from local offices.

Permits you'll need

  • Base of Operation food service permit
  • Mobile Food Unit permit (one per unit)
  • Out-of-county Mobile Food Unit Authorization to Operate
  • Temporary Food Service vendor permit
  • Occupation Tax Certificate (business license)
  • Local zoning and fire approvals

Commissary and plan review

Commissary required
Yes
How it works
Your unit application names your permitted base, its owner and its permit number. You go back daily while you are operating to take on drinking water and empty wastewater, either into the base's utility sink or at a dump station. Your menu is limited to what you filed with the base plans, and the district keeps no list of approved commissaries.
Plan review required
Yes

Sinks and water

Sinks
A three-compartment sink with drain boards and a separate handwashing sink.
Water tanks
Wastewater capacity must exceed all drinking water storage, the water heater tank included, by 15% or more. The water heater needs 10 gallons or more of storage and an element of 2.5 kW or the equivalent.

Fees

Permit fees
Mobile unit annual inspection fee (schedule effective January 1, 2020): Risk Type I $140, Type II $195, Type III $250. New fees start January 1, 2027: $180, $250 or $320, and the out-of-county authorization becomes $35.
Plan review fee
There is no separate mobile plan review line. New food service plan review runs $270 to $435 depending on risk type, with $110 to resubmit (effective January 1, 2020). Starting January 1, 2027 it runs $346 to $557, with $141 to resubmit.

As published in November 2026. Fees change, so confirm before you apply.

Inspections, events and fire safety

Inspection
Send scaled plans showing all equipment and sinks, tank sizes and water heater specs; the district may accept photos instead. The unit must sit fully on wheels and have steady power for refrigeration. Show your name, address and permit number on the unit in letters 2 inches tall or more, and keep your permit and latest inspection report where the public can see them. You can list up to 2 sites or 4 routes and must report changes at least 7 days ahead.
Events and markets
Booth vendors at for-profit temporary events apply at least 30 days ahead, and permits last up to 14 days in a row. The vendor application lists $105 for 1 to 4 days and $155 for 5 to 14 days; from January 1, 2027 fees change to $58 to $64 for review plus $77 to $134 for inspection, with $80 for late applications. Events of 120 hours or less put on by a county, city or IRS-recognized nonprofit skip the regular temporary permit.
Fire safety
The district posts fire guidance that local fire authorities reviewed, but it notes the fire marshal does not regulate mobile units directly. It calls for a 2A20BC extinguisher serviced every 12 months, propane tanks that are vented and secured, and wiring to NFPA 70. Fire marshal contacts are listed for Cobb County (also covering Kennesaw), Marietta and Austell.

Food handler and business license

Business license and taxes
Every mobile food vendor registers with a business license office. In unincorporated Cobb you need an Occupation Tax Certificate for each location, even for temporary work, and you email the county office to learn the fee. If you sell inside one of the six cities (Acworth, Austell, Kennesaw, Marietta, Powder Springs, Smyrna), apply with that city instead.

Anything not covered here: ask Cobb & Douglas Public Health, Center for Environmental Health before you apply.

Official links

Application and forms

Resources for new cart owners

Some resource links are referral links. We may earn a fee, at no cost to you.

Common questions

Who issues coffee cart permits in Cobb County?

Cobb & Douglas Public Health, Center for Environmental Health. The health district issues the food permits. Business licensing is through Cobb County in unincorporated areas or through the city you sell in, and zoning and fire approvals come from local offices.

Does a coffee cart in Cobb County need a commissary?

Your unit application names your permitted base, its owner and its permit number. You go back daily while you are operating to take on drinking water and empty wastewater, either into the base's utility sink or at a dump station. Your menu is limited to what you filed with the base plans, and the district keeps no list of approved commissaries.

Is plan review required for a coffee cart in Cobb County?

Yes. Submit plans before you build or buy the cart. Fee: There is no separate mobile plan review line. New food service plan review runs $270 to $435 depending on risk type, with $110 to resubmit (effective January 1, 2020). Starting January 1, 2027 it runs $346 to $557, with $141 to resubmit..

How much does a coffee cart permit cost in Cobb County?

Mobile unit annual inspection fee (schedule effective January 1, 2020): Risk Type I $140, Type II $195, Type III $250. New fees start January 1, 2027: $180, $250 or $320, and the out-of-county authorization becomes $35. (as of November 2026). Fees change, so confirm before you apply.

Can I serve at events in Cobb County with my cart?

Booth vendors at for-profit temporary events apply at least 30 days ahead, and permits last up to 14 days in a row. The vendor application lists $105 for 1 to 4 days and $155 for 5 to 14 days; from January 1, 2027 fees change to $58 to $64 for review plus $77 to $134 for inspection, with $80 for late applications. Events of 120 hours or less put on by a county, city or IRS-recognized nonprofit skip the regular temporary permit.

Please note: Requirements change. This is a summary, not legal advice. Confirm with the county before buying equipment.